Wind farm labour hire

Plant operators, trade assistants and labourers for wind farm civil works and construction. We supplied more than 10 talent to Rye Park Wind Farm in the Southern Tablelands of NSW.

TradeConnex talent on a wind farm project

How we crew wind farm projects

A large share of the labour on a wind farm goes in before any turbine arrives: access tracks, crane hardstands, foundations and cable trenching spread across kilometres of farmland. That needs plant operators comfortable on haul roads and compaction, and labourers and trade assistants who can keep going through long days on an exposed site.

At Rye Park Wind Farm, north of Yass and east of Boorowa, we supplied more than 10 talent between April and October 2022, including moxy operators, roller operators, trade assistants and skilled labourers.

For foundation pours and lifts we can add steel fixers, concreters and licensed riggers and dogmen.

10+
Talent placed at Rye Park Wind Farm, NSW

What we cover

Access tracks and hardstands

Moxy, roller and excavator operators with civil labourers to build the tracks and crane pads that turbine components are delivered and lifted on.

Turbine foundations

Steel fixers, concreters and labourers for reinforcement cages, formwork and the large concrete pours each turbine base needs.

Lifting support

Riggers and dogmen holding the High Risk Work Licence the lift requires, with trade assistants supporting the installation crew on the ground.

Cabling and reinstatement

Operators and labourers for trenching, cable laying support and backfill between turbines and the substation, then reinstatement of the land.

Why contractors use TradeConnex

Screened before they're put forward

An initial screen of trade experience, a face-to-face interview and reference checks before anyone reaches your site.

Site-ready from day one

Talent arrives with the PPE the job needs and their tickets confirmed: White Card, high-risk work licences, plant tickets or RIW accreditation.

Flexible hire

A minimum of four hours per day per person, from short-term cover to full project durations, with the option to take talent on permanently.

Recruiters who know site work

Many of our team have worked on construction and solar sites themselves. Call us on 1300 995 234.

Wind Energy FAQs

Yes. At Rye Park Wind Farm our crew included moxy and roller operators alongside trade assistants and skilled labourers. We check each operator’s competencies for the machine before they start.

All construction talent we put forward holds a White Card. Riggers and dogmen need a High Risk Work Licence for the class of work, such as Dogging (DG), and electricians need a current state electrical licence. We confirm these before anyone goes to site.

Tell us the site location, roster and whether camp or local accommodation is provided when you book. We’ll put forward talent who can work that arrangement for the length of the job.

Yes. Alongside labour hire we supply site managers and HSE advisors, and our permanent recruitment team can fill roles you want on your own books.

Request talent for your wind farm project

Send us the trades, headcount, site and start date, and we'll put forward talent who fit.

Prefer to talk?

1300 995 234
Close
Close

Please make a selection

I’m a Candidate looking for work
I’m an Employer looking for candidates

Thank you

Your form has been submitted successfully and we appreciate your interest. Our team will review the information provided and be in contact shortly.

If you have any immediate questions, please do not hesitate to contact us.

Back to main site